DCB0129 in one line (UK)
What the CSO actually “signs” (the deliverables that matter)
Pricing: charge for releases, not for feelings
The CSO contracting playbook (MECE, startup-friendly)
Step 1 — Define scope and safety boundary
Step 2 — Build the minimum clinical safety management system
Step 3 — Run hazard identification like a consultancy workshop
Step 4 — Convert hazard log into a Safety Case narrative
Step 5 — Commercialise with a retainer + release fees
Step 6 — Training pathway (book the official route)
Save your place and choose what comes next
Work through this guide (6 steps)
Use the actions from this article to track what you have worked through.
Sign in using the reading controls above to save your steps.
MECE scope statement: what the product does, what it does not do, and where it interfaces (EPR, PAS, triage, messaging, CDS). If you cannot draw the boundary, you cannot own the risk.
Return to this sectionSet cadence: monthly safety review; per-release safety gate; incident review. Define roles: Product (decision maker), Engineering (controls), Clinical (risk owner).
Return to this sectionUse structured techniques (e.g., HAZID/SWIFT/functional failure analysis) to populate hazards, causes, controls, residual risk, and monitoring. This becomes the hazard log backbone.
Return to this sectionA safety case is boardroom-ready: what could harm patients, how you prevented it, what’s left (residual risk), and why that’s acceptable for this release.
Return to this sectionRetainer (e.g., 0.5–1 day/month) covers governance, incident input, and stakeholder management. Release fee covers hazard log + safety case updates and sign-off.
Return to this sectionStart with NHS Digital Clinical Safety “Essentials” and “Intermediate” e-learning, then book the Practitioner course (explicitly positioned as the pathway for those looking to become a Clinical Safety Officer).
Return to this section
Digital tools · Article 2 of 28